A designer wants to postpone a message but changes re-entry cooldown. Another wants to end an unanswered question but adds a delay afterwards. Both may use minutes while controlling different events.
Delay postpones run progression
A delay step waits for its configured continuation time and depends on the resume path and controls. It does not mean the customer answered or reopen a channel reply window. See waiting and delayed resumption.
Human intervention or changed eligibility during waiting may prevent continuation. Elapsed time alone does not guarantee the next message, and delay should not bypass human control or sending rules.
Answer timeout concerns a pending reply
Its timing belongs to the waiting-question contract and determines configured behaviour when no answer arrives. The design needs an understandable outcome rather than a longer wait without purpose.
Test an answer before the deadline, no answer and later contact. A message after the state changed should not automatically count as a valid answer to an old prompt. Current context determines handling.
Re-entry governs a new beginning
Once-only and cooldown rules determine whether the contact may enter again. They are not waiting steps inside the current run. See re-entry scope for current history-based behaviour.
Testing therefore needs an actual new entry attempt with appropriate context, ensuring an existing run or another gate does not decide first.
Label each duration by its question: when progression resumes, when answer waiting ends or when another start is allowed. Test each clock and boundary separately. Staff can then adjust the intended behaviour without trying to repair an internal wait through a rule governing a future run that has not started.