Automation

Start another flow transfers the journey rather than returning to the original

A designer splits a long journey into reception and detail flows, then adds a message after start another flow expecting execution to return.

2 min readLast updated November 4, 2026
An operations specialist arranging a customer conversation workflow

A designer splits a long journey into reception and detail flows, then adds a message after start another flow expecting execution to return. Current behaviour transfers to a linked journey and ends the original run. It is not a returning subroutine.

Put continuation in the appropriate journey

Place post-detail actions in the target or design another valid transition without a cycle. Validation rejects outgoing connections after the transfer node so the graph does not imply an unsupported continuation.

The target must be published, within the organisation, on the same channel and configured for the appropriate manual start. This step does not turn a WhatsApp flow into Instagram communication or make a draft eligible merely because its name was saved.

Review dependencies between journeys

Target availability, re-entry rules or run capacity may change before execution. A valid design does not guarantee every later transfer. Test both published journeys and inspect dependencies before stopping one referenced elsewhere.

Controls reject circular links and review transition paths within current limits. Do not chain journeys to bypass cycle prevention or create endless repetition. Each journey should have a clear purpose and ending.

Verify transferred information

The current path passes session variables to the linked run with a parent-run reference. Review names and meanings before relying on them. Transfer does not automatically supply every piece of information outside that session context.

See session answers versus persistent contact fields when deciding what to retain. Contact data may later change, so identify which source the target actually reads.

Acceptance should follow the first flow into the second, establish the correct next question or action and inspect both run states and used information. If the first ends without expected target progress, investigate transfer rather than attach messages after a terminal node that will never return control.