A customer sends a storefront photograph and says, “I want something like this.” The image can explain a visual direction without establishing production dimensions, materials or site conditions. A simple confirmation may leave both sides approving different things.
Three approvals with different meanings
Collect the project reference, location and purpose, then separate artwork from measurements confirmed by the responsible specialist. A customer may approve lettering while a site survey remains pending. Record both states instead of using one broad approved label.
Installation also needs a defined location, appointment, access coordination and responsible approving party. Artwork approval does not settle preparation, permissions or technical suitability. Assign those requirements to the appropriate specialists within the project scope.
Connect approval to the correct file
When sending a proof, identify its reference and the part requiring approval. If the customer changes the displayed telephone number, ensure the production file changes too. Keep the approval connected to its intended proof.
For multiple branches, maintain a site-specific record covering shared design, local differences, approved dimensions and execution status. Approval for the first branch does not automatically cover every location sharing its identity.
Let the flow collect appropriate inputs
A Taloo intake journey can ask about request type, location and available artwork before routing details to the appropriate employee. Measurements, suitability and execution method require specialist approval. Customer answers alone should not declare the project production-ready.
After review, send a clear summary of the agreed version and outstanding measurements, files or appointments. Name subsequent changes and obtain relevant confirmation instead of issuing a general message that could be interpreted as covering everything.
Review quotation versions and approval before production begins. A useful conversation lets another employee establish exactly what the customer approved, what remains open and which file the next department should use.



