Integrations

The integration displays a date in 1970: inspect timestamp units before timezone settings

A receiver displays a date far from the event, so staff begin adjusting timezone offsets. Sometimes the value is seconds interpreted as milliseconds, or a conversion happened twice. An hour difference cannot repair a unit…

2 min readLast updated November 4, 2026
A developer and colleague reviewing a connection between business systems

A receiver displays a date far from the event, so staff begin adjusting timezone offsets. Sometimes the value is seconds interpreted as milliseconds, or a conversion happened twice. An hour difference cannot repair a unit mismatch.

Read the field contract, not just digit count

Establish whether the value is Unix seconds, milliseconds or a formatted date with specified timezone semantics. Different fields called timestamp can follow different contracts even inside one integration.

For example, JavaScript Date uses a numeric representation in milliseconds since the beginning of 1970 in UTC. Supplying seconds where that representation is expected can produce a date near the epoch instead of the intended event time.

Give conversion a defined boundary

In the reviewed Taloo paths, the numeric Developer Webhook attempt timestamp is prepared in seconds, while the Meta message adapter interprets its incoming timestamp field as milliseconds. These illustrate distinct contracts rather than a rule to transform every incoming or outgoing date identically.

Identify where values become the agreed internal representation and retain appropriate source evidence. Once a value is already a formatted date, do not divide it by a thousand merely because the original upstream field used milliseconds.

Verify meaning after conversion

Use a known-time synthetic event and compare results across the conversion and chosen display timezone. Include missing and invalid values. Zero should not automatically become a real historical date where the source provided no time.

Once units are correct, distinguish event, attempt and reception times, then inspect timezone. These are independent questions and several may matter. Do not alter a raw body before signature verification where the receiving contract requires it.

A useful correction records field name, unit, conversion boundary and expected result. Another employee can then follow the cause instead of adding another hour offset whenever a displayed date differs from the source system.